Block title
Block content
Abadan Refinery Operations Director:
Catalytic Cracking Compressor Problem Was Solved in No Time
دوشنبه 4 مرداد 1395

 

Abadan Refinery (Public Relations): Following the news release about the heavy smoke in Abadan Refinery, the refinery operations director, Fereydun Janaki, announced that the problem was solved in no time.  

He said that phase 3 catalytic cracking compressors interrupted due to power failure, however, with the consistent effort of the unit staff, after half an hour the problem was resolved and the situation returned to normal.  

He emphasized that obviously, these incidents are common and inevitable in every refinery.

 

دانلود تصویر خبر

Comments

لوگوی جشنواره وب و موبایل ایران